Professional drying usually takes about 3 to 5 days for a typical clean-water leak, and longer for hardwood, plaster, basements or sewage. The job is done when moisture readings show materials are back to normal, not when they feel dry.
What makes it take longer
- How long it sat wet before drying started.
- Materials: hardwood, plaster, concrete and layered flooring hold water longer than drywall and carpet.
- Where it is: basements and crawl spaces stay damp.
- Dirty water: sewage and floodwater mean more removal and cleaning before drying.
- Weather: humid weather slows drying.
Feels dry isn't the same as dry
Drywall and subfloor can feel dry on the surface and still be wet inside. A water damage company uses moisture meters and records readings each day. Closing up walls or laying new flooring over wet materials traps moisture and can lead to mold.
Can I dry it myself?
For a small clean-water spill caught right away, fans, a dehumidifier and open windows in dry weather may be enough. For anything soaked into walls, under floors or across rooms, rented box fans usually aren't enough, and you won't have readings to show your insurer.
Start fast
Mold can start within 24 to 48 hours on wet materials. Your policy also expects you to prevent further damage. See your duty to prevent further damage.
Common questions
Should I leave the drying equipment running at night?
Yes, unless the company tells you otherwise. Turning it off resets progress.
Can I stay in the house while it dries?
Often, for clean-water jobs. With sewage, mold or no working kitchen or bathroom, ask about additional living expenses.
Why is my electric bill higher?
Drying equipment uses a lot of power. Keep the bill; some insurers reimburse the extra cost.